At 22:29hrs, as Christmas Night was coming to a close, Truck 21 and Battalion 21 were requested for the residential fire in Fulsheur. After a 25+ mile response Truck 21 was assigned to set-up for aerial operations one block over from the fire involving a large 4600 square ft 2-story SFD. With the fire knocked down from the A side by Tower 81 Truck 21 was reassigned to the A side and assisted with interior operations. Following completion of assignments, and a long trek home, Truck 21 and Battalion 21 returned to the city at approximately 02:00hrs.
